By the end of the summer, the new Phyllon Bridge is expected to be completed, and at the beginning of 2024 the entire project, which includes the new bridge at Afrati as well as the restoration of the bridge at Vassiliko.
At the same time, the local road network will be restored and improved, while anti-flood settlement and anti-corrosion protection works will be carried out.