The wind farm is located in Kastri, in the area of high wind potential of South Evoia, and according to the terms of the production license the project includes the dismantling and radical renewal of its equipment (repowering).
For the operation of the project with the new equipment, a 20-year contract has been secured for the sale of the produced energy at a Reference Price through a RAE tender.
Within the second half of 2022, its construction is expected to be completed and the farm is expected to be put in operational mode.