EYDAP inks MoU with Lamda Development on Ellinikon
EYDAP inks MoU with Lamda Development on Ellinikon

EYDAP inks MoU with Lamda Development on Ellinikon

The MoU refers to the water supply, drainage and facility for the production of recycled water, as well as an urban and peri-urban distribution network
Share Copy Link
RE+D magazine
28.07.2022

EYDAP announced the conclusion of a Memorandum of Cooperation and Understanding with Lamda Development S.A., through its subsidiary ELLINIKO S.A. ("LAMDA") which concerns the water supply, drainage and facility for the production of recycled water, as well as an urban and peri-urban distribution network of recycled water to cover the needs of the Metropolitan Pole Hellinikon - Agios Kosmas.

The Memorandum was signed in the context of the implementation of the Integrated Development Plan (IDP) of the Hellinikon - Agios Kosmas Metropolitan Pole of the Attica Region, with the aim of utilizing and redeveloping the site of the former Hellinikon airport.

EYDAP, in the context of the cooperation with ELLINIKO S.A., will supervise the construction of the water supply, drainage, production and disposal of recycled water projects, while, after their completion, it will assume responsibility for their operation, maintenance and management . 

EYDAP will also carry out large-scale projects in order to ensure the adequate coverage of the water supply needs of the Metropolitan Pole of Hellinikon which are estimated at 17,000 cubic meters per day in its full development. 

Finally, the construction of a recycled water production facility is planned which will cover the needs of the communal and open green spaces of Hellinikon Park. The capacity of the above installation, in full development, will be of the order of 7,000 cubic meters per day.