The project has a total budget of €8.99 million (value with VAT €11.1 million) and the Contracting Authority is the Municipality of Tinos. According to the announcement, the works should have started on 06/30/2023 and be completed by 12/31/2023.
The main purpose of the system is the gathering of information from all Water Supply facilities in a Control Center and their overall processing.
In combination with the Water Resources management system and the electronic mapping of all water transport and distribution networks, it will lead, through appropriate software, to the immediate global presentation of water reserves, consumption, water balance, water quality monitoring and the drastic reduction of operational cost.
Subsequently and through the experience gained in creating a daily plan, the engineers, foremen and water managers will achieve the optimal operation of the water supply system controlled by the Municipality.
The monitoring and control processes of the networks will be carried out by software installed in the Central Control System (CSC), and will contribute to the management of water resources, through the existing control systems, as well as by connecting ninety (90) local control stations (wells – tanks), 20 internal quality control network stations (network edges) and with 100 Local Consumption Control Stations (LCSCs), which include Digital Water Meters for Wireless Transmission of Consumption.