Markets

The timetable of the issuance of the Bond Loan and the Public Offering of the Bonds will be determined in the near future.

Organic NPE reduction was notable – down almost 1 percentage point in the quarter – with a negligible impact from clients in default 11 months after the end of the Covid-19 moratoria.

There's a general pressure from institutional authoritries to have the existing building stock replaced with zero-emission buildings (net-zero)

The projects that are being under development by the Ministry of Infrastructure and Transport in collaboration with ERGOSE.